PSE&G Air Cooled Condenser Project

 In Power Generation

PSE&G Air Cooled Condenser Project

Milco provided the following scope of work: field assembly of steam duct; field assembly of 8 dual cell and 4 single cell modules; erection of 467 tons of structural steel; installation of ACC modules (275 tons each); erection of 260 tons of steam duct; installation of all piping; testing of all new duct work and piping; installation of 30,000 feet of sheeting; and transportation and setting of turbine exhaust duct (TED).

MARKET

LOCATION

OWNER

Power Generation

Bridgeport, CT

PSE&G

Receive our Steel Report

Gain industry insights on what drives the cost of structural steel

Recent Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search