PSE&G Air Cooled Condenser Project
PSE&G Air Cooled Condenser Project
Milco provided the following scope of work: field assembly of steam duct; field assembly of 8 dual cell and 4 single cell modules; erection of 467 tons of structural steel; installation of ACC modules (275 tons each); erection of 260 tons of steam duct; installation of all piping; testing of all new duct work and piping; installation of 30,000 feet of sheeting; and transportation and setting of turbine exhaust duct (TED).
MARKET
LOCATION
OWNER
Power Generation
Bridgeport, CT
PSE&G